Condition survey
- Measurements and visual inspection
- Review of accessible services
- Record of retained elements
Apartment renovation in Yerevan
A condition-led renovation of an occupied or previously finished apartment.
Existing apartments in Yerevan vary greatly: some need only a careful refresh, while others contain ageing services and several layers of earlier work. We determine the depth after an on-site survey.
Elements worth retaining are recorded before strip-out. If concealed defects appear later, we document them and agree the cost and programme impact before proceeding.

01
We separate retained, repaired and replaced elements in the estimate.
02
We separate retained, repaired and replaced elements in the estimate.

03
Some defects cannot be confirmed before finishes are opened. The safe approach is to identify likely risks, define an approval procedure and document discoveries.


04 · Process
Assess condition, history and objectives.
Separate retention, repair and replacement.
Open only agreed areas.
Record and agree concealed findings.
Renew what the apartment needs.
Complete compatible systems and details.
Inspect and accept the completed stages.
05
The age of the building alone does not define the work.
Original parquet or doors may be valuable and serviceable.
New findings are not turned into unapproved work.
Noise periods, common areas and deliveries are planned carefully.
AMD · timeframe
Labour starts from AMD 40,000/m². Existing layers, utility condition, retention work and access affect the cost.
Duration depends on the selected depth. A major existing-apartment renovation commonly takes 2–4 months after the scope is confirmed.
Completed projects

Existing services and substrates were renewed while the layout remained practical.
View project →
The original parquet was restored and the apartment prepared for long-term rental.
View project →FAQ
No. The substrate, services and intended result determine the depth.
No. Some conditions become visible only after agreed areas are opened.
Only where condition, the new layout or compatibility requires it.
Yes, when condition and construction sequence permit.
We explain the reason, price and timing and proceed after approval.
That depends on the layout and complexity of the proposed solutions.
Sometimes, although dusty and engineering stages often connect several rooms.
Through the project lead, shared chat, reports and stage approvals.