Renovation and fit-out in Yerevan

Kitchen renovation in Yerevan

Kitchen renovation planned around future furniture, appliances and every service connection.

We carry out partial and complete kitchen renovations with the future furniture, appliances, water, drainage, electrics, lighting and finishes considered together. Positions and loads are agreed before the estimate and work sequence.

We do not claim to manufacture kitchen furniture ourselves. Construction is coordinated with the selected supplier’s design so that outlets and dimensions match the future fit-out.

Kitchen after complete renovation
Starting labour pricefrom AMD 200,000 per roomMaterials are priced separately. We confirm the scope and cost in an itemised estimate after a free site visit.

01

What should be decided before work starts

The earlier furniture and appliances are agreed, the lower the risk of moving outlets after finishes.

  • Room dimensions and basic furniture arrangement.
  • Appliance list and positions.
  • Water, drainage and ventilation points.
  • Electrical loads, sockets and lighting.
  • Condition of floor, walls and ceiling.

02

What kitchen renovation may include

The earlier furniture and appliances are agreed, the lower the risk of moving outlets after finishes.

Planning

  • Measurements and condition
  • Furniture and appliances
  • Service drawings

Preparation

  • Strip-out
  • Wall and floor levelling
  • Preparation of the splashback area

Building services

  • Water and drainage
  • Electrics and lighting
  • Ventilation and connections

Finishes

  • Walls, floor and ceiling
  • Splashback and junctions
  • Installation of agreed elements
Furniture, appliance and service plan

03

Water, electrics and furniture are planned together

Before walls are closed, we check connections against the sink, dishwasher, refrigerator, oven, hob, extractor and other appliances.

  • loads and dedicated electrical circuits
  • drain routes and falls
  • socket and outlet heights
  • ventilation and extraction
  • control dimensions for furniture
Electrical and plumbing outlets
Finished room before kitchen installation

04 · Process

How the work is organised

  1. 01

    Survey

    Measure and assess the room.

  2. 02

    Layout

    Agree furniture, appliances and services.

  3. 03

    Estimate

    Fix scope, materials and sequence.

  4. 04

    Strip-out

    Remove agreed finishes and inspect substrates.

  5. 05

    Services

    Install and test the required outlets.

  6. 06

    Preparation

    Level surfaces for the selected finishes.

  7. 07

    Finishes

    Complete floor, walls, splashback and ceiling.

  8. 08

    Acceptance

    Check outlets, dimensions and systems installed by us.

05

Partial refresh or complete renovation

Partial work

Paint, splashback, flooring or selected outlets where the substrate permits.

Complete renovation

Strip-out, preparation, utilities and finishes for the future kitchen.

Furniture is separate

The selected supplier manufactures it; we coordinate the construction interface.

Technical defects

Old wiring and pipes are not hidden behind new cabinet fronts.

AMD · timeframe

Cost and expected duration

Complete kitchen labour starts from AMD 200,000 per room. Strip-out, substrate condition, service points, splashback and finish complexity affect the estimate.

Duration depends on preparation, utilities, deliveries and readiness of the furniture design. Furniture production follows the supplier’s separate programme.

FAQ

Questions about this service

Must the kitchen furniture be ordered before renovation?

Not necessarily, but dimensions, layout and service requirements should be agreed first.

Do you manufacture kitchen furniture?

We do not claim in-house manufacture; we work with the selected supplier’s project.

Can you replace only the splashback or flooring?

Yes, where the substrate and adjacent finishes allow safe local work.

Who connects appliances?

Agreed connections can enter the estimate; manufacturer requirements are checked separately.

Can the sink be moved?

Sometimes, if the drainage route, fall and layout permit it.

Who buys the materials?

You or the company, using pre-approved items and terms.

When is the exact price known?

After inspection and agreement on furniture, appliances, utilities and finishes.

Can the kitchen remain in use?

Use is normally substantially restricted during a complete renovation.

Yerevan Remont Pro

Let’s discuss your property

Leave your phone number and a short description. A specialist will clarify the scope and offer a time for a free site visit.

Request sent

Our operator will contact you within 15 minutes.