Preparation
- Measurements and equipment plan
- Agreed strip-out
- Assessment of exposed substrates
Renovation and fit-out in Yerevan
A coordinated wet-area renovation covering plumbing, electrics, waterproofing and tiling.
We renovate bathrooms, combined bathrooms and separate WCs. Existing utilities and substrates are checked first; equipment positions are then agreed before strip-out, services, waterproofing and finishes are sequenced.
The visible tile is only part of the result. Pipe routes, joints, falls, substrates and the applicable waterproofing system are checked before they become concealed.

01
The exact scope depends on the utilities, substrate and selected equipment.
02
The exact scope depends on the utilities, substrate and selected equipment.

03
Before tiling, we inspect what will become inaccessible. The technical system is selected for the actual substrate, materials and property conditions.



04 · Process
Measure and review accessible services.
Agree equipment, tile layout and outlets.
Fix strip-out, services and finishes.
Open agreed areas and assess the substrate.
Install and test utilities and waterproofing.
Tile and complete all surfaces.
Install agreed sanitaryware and lighting.
Test systems and resolve comments.
05
Dimensions and axes are fixed before utility outlets.
Geometry is prepared for the selected format and layout.
Critical connections and equipment remain maintainable.
Primers, waterproofing, adhesive and grout are treated as a system.
AMD · timeframe
Complete bathroom labour starts from AMD 180,000 per room. Area, strip-out, services, tile format and equipment determine the final estimate.
Duration is confirmed after inspection and depends on preparation, curing, tile format, deliveries and equipment installation.
Completed projects

Plumbing, waterproofing, underfloor heating and large-format finishes were coordinated.
View project →
Utility alterations and difficult junctions were resolved before finishing.
View project →FAQ
Yes. This service covers bathrooms, combined bathrooms and separate WCs.
Yes, if substrates and services allow safe local work.
Not automatically; the required areas and system are listed in the estimate.
You can buy them or ask us to procure pre-approved items.
After inspection; concealed defects found during strip-out are agreed separately.
That depends on scope, layout and whether another bathroom is available.
Yes, where included in the agreed technical design.
From one year for contracted work, with the exact term depending on work type.
Related pages
Yerevan Remont Pro
Leave your phone number and a short description. A specialist will clarify the scope and offer a time for a free site visit.