Planning
- Existing network review
- Loads and equipment
- Point and circuit plan
Renovation and design in Yerevan
Electrical circuits, points, lighting and distribution boards designed around real loads.
Electrical work may be ordered separately or within renovation. Loads, equipment, furniture and the existing network are reviewed first.
Points and circuits should be fixed before walls and ceilings close. Rewiring and boards are estimated separately.

01
The exact scope follows inspection, substrate condition and agreed responsibility boundaries.
02
The exact scope follows inspection, substrate condition and agreed responsibility boundaries.

03
Every outlet or switch needs a real load, height and use scenario.


04 · Process
Clarify the objective, property and boundaries.
Check dimensions, condition and constraints.
Agree the technical approach and expected result.
Record scope, price and related work.
Prepare the site, information and materials.
Complete the agreed work in sequence.
Inspect the result and record any comments.
05
Its exact composition is defined in the estimate.
Individually estimated by circuits and board.
Chasing and surface repair are not automatic.
Luminaires and automation follow the agreed list.
AMD · timeframe
Electrical point installation starts from AMD 4,000; board installation from AMD 30,000. Rewiring is individually priced.
Duration depends on circuit count, drawings, substrates and other renovation stages.
Completed projects
FAQ
Sometimes, after checking connection to the existing network.
Complex properties benefit from one; simpler work still needs a point plan.
Before first fix and after furniture planning.
Only when listed.
You or the company under an agreed list.
After its composition is defined.
Circuits are inspected and recorded before closure.
From one year for contracted work.
Related pages
Yerevan Remont Pro
Leave your phone number and a short description. A specialist will clarify the starting information and suggest the next step.