Renovation and design in Yerevan

Plumbing work in Yerevan

Water, drainage, heating and equipment installation checked before finishes conceal connections.

Plumbing can be ordered separately or within bathroom, kitchen, apartment and house renovation. Equipment, routes and existing services are reviewed first.

Moving a point requires suitable drainage falls, pressure, material compatibility and access for testing.

Plumbing in a completed bathroom
Starting pricefrom AMD 10,000 per pointMaterials and third-party equipment are priced separately. The final scope follows inspection or review of the brief.

01

Typical tasks

The exact scope follows inspection, substrate condition and agreed responsibility boundaries.

  • Water and drainage points.
  • Agreed pipe replacement.
  • Kitchen and bathroom relocations.
  • Sanitaryware and frames.
  • Heating and underfloor heating where designed.

02

What plumbing work may include

The exact scope follows inspection, substrate condition and agreed responsibility boundaries.

Review

  • Existing services
  • Equipment plan
  • Accessible mains

First fix

  • Water supply
  • Drainage falls
  • Frames and provisions

Heating

  • Connections to design
  • Underfloor heating
  • Applicable tests

Second fix

  • Sanitaryware
  • Equipment connections
  • Leak checks
Water and drainage before closure

03

Connections are checked before concealment

Concealed work is inspected and photographed; serviceable parts remain accessible.

  • outlets match equipment
  • drainage falls
  • joint integrity
  • secure routes
  • maintenance access
Connection and frame checks
Equipment installed before handover

04 · Process

How the work is organised

  1. 01

    Brief

    Clarify the objective, property and boundaries.

  2. 02

    Survey

    Check dimensions, condition and constraints.

  3. 03

    Decisions

    Agree the technical approach and expected result.

  4. 04

    Estimate

    Record scope, price and related work.

  5. 05

    Preparation

    Prepare the site, information and materials.

  6. 06

    Delivery

    Complete the agreed work in sequence.

  7. 07

    Acceptance

    Inspect the result and record any comments.

05

Scope and pricing boundaries

Water point

Route and composition are defined.

Pipe replacement

Individually estimated.

Client equipment

Installed when complete and compatible.

Making good

Tiles and boxes are separate unless listed.

AMD · timeframe

Cost and expected duration

Water point installation and sanitaryware installation start from AMD 10,000. Pipe replacement is individually priced.

Duration depends on points, routes, access and equipment readiness.

FAQ

Questions about this service

Can only part of a pipe be replaced?

Yes, after checking condition and compatibility.

Can you install my sanitaryware?

Yes, when complete and compatible.

Can points be moved?

Where routes, falls and construction allow.

Do you work with heating?

Yes, to an agreed technical design.

Do you install underfloor heating?

Yes, where designed.

Who buys materials?

You or the company under an approved list.

How is concealed work checked?

By applicable tests and records before closure.

What warranty applies?

From one year for contracted work.

Yerevan Remont Pro

Let’s discuss your project

Leave your phone number and a short description. A specialist will clarify the starting information and suggest the next step.

Request sent

Our operator will contact you within 15 minutes.