Review
- Existing services
- Equipment plan
- Accessible mains
Renovation and design in Yerevan
Water, drainage, heating and equipment installation checked before finishes conceal connections.
Plumbing can be ordered separately or within bathroom, kitchen, apartment and house renovation. Equipment, routes and existing services are reviewed first.
Moving a point requires suitable drainage falls, pressure, material compatibility and access for testing.

01
The exact scope follows inspection, substrate condition and agreed responsibility boundaries.
02
The exact scope follows inspection, substrate condition and agreed responsibility boundaries.

03
Concealed work is inspected and photographed; serviceable parts remain accessible.


04 · Process
Clarify the objective, property and boundaries.
Check dimensions, condition and constraints.
Agree the technical approach and expected result.
Record scope, price and related work.
Prepare the site, information and materials.
Complete the agreed work in sequence.
Inspect the result and record any comments.
05
Route and composition are defined.
Individually estimated.
Installed when complete and compatible.
Tiles and boxes are separate unless listed.
AMD · timeframe
Water point installation and sanitaryware installation start from AMD 10,000. Pipe replacement is individually priced.
Duration depends on points, routes, access and equipment readiness.
Completed projects
FAQ
Yes, after checking condition and compatibility.
Yes, when complete and compatible.
Where routes, falls and construction allow.
Yes, to an agreed technical design.
Yes, where designed.
You or the company under an approved list.
By applicable tests and records before closure.
From one year for contracted work.
Related pages
Yerevan Remont Pro
Leave your phone number and a short description. A specialist will clarify the starting information and suggest the next step.